Tender Notice for Construction of Beijing Yanchang Street Light Project in Chengnan New District


Tender No.: YCS200908041
Tendering Agent: Yancheng Shuangqing Project Cost Consulting Co., Ltd. Owner: Yancheng Chengnan New District Development and Construction Headquarters Application Deadline: 2009-08-31
Region: Jiangsu Industry: Water Conservancy Bridge Construction, Electrical and Electronic Appliances

1. The north extension project of Daizhuang Road, the development and construction headquarters of Yancheng Chengnan New District has been approved by Yancheng Development and Reform Commission (Yanfa Reform [2007] No. 177). The source of funding for the project is self-financing and has been implemented. The project will be openly tendered for the streetlight project of the project, and the construction contractor will be selected as the best.
2. Yancheng Shuangqing Project Cost Consulting Co., Ltd. is entrusted by the tenderee to be responsible for the tendering of the project.
3. Project Overview
(1) Project Location: Daizhuang Road, South New District, Yancheng City
(2) Project scale: The total length of the road is about 2,500 meters and the width is 32 meters. The investment in street lighting projects is about 3 million yuan;
(3) Required construction period: It is planned to start construction in September 2009, and specifically obey the project construction period requirements.
(4) Scope of the contract: The construction of the north extension streetlight project of Daizhuang Road. The details are based on the valid written documents provided by the tenderee. The project is a tender.
4. The method of contracting the bidding project: labor and materials.
5. The main qualifications that the bid applicant should have
(1) Applicant qualification category and grade: An independent legal person with the qualification of construction of the city and road lighting engineering contracting level 3 and above, the applicant must have a safety production license.
(2) Project manager qualifications and requirements: must be the bidder. The unit has qualifications of three or more levels. (Level 2 and above qualification project managers should provide the municipal public professional construction qualification registration certificate or temporary practice qualification when participating in the bidding. Certificate; the project manager of the third-level construction qualification shall provide the project manager's position employment certificate), and there is currently no construction in progress (if there is a complaint or reflection, the respondent shall provide the project manager issued by the construction administrative department where the project is located. The written certificate of the construction in progress), the project manager who intends to apply for the bid must have a safety production assessment certificate (Class B). Project managers who pass the prequalification are not allowed to change when bidding.
(3) The applicant for bidding must establish a construction site management agency. The members of the on-site management organization qualified for pre-qualification are not allowed to change when bidding. During the construction phase of the project, the tenderee will bid on the on-site management organization and its personnel of the winning bidder. Committed to strict assessment. The project manager and the chief technical officer shall not be replaced in the middle without the permission of Party A.
6. The bidders of this bidding will not accept the bidding of the consortium.
7. If there are more than 9 bidders qualified for pre-qualification, the tenderee may use the “full enrollment method” to invite all bidders who are qualified for pre-qualification to participate in the bidding, or may determine no less than 9 bidding applications through the “draw-up method”. If the number of tender applicants qualified for pre-qualification is less than 9, the tenderer shall use all the pre-qualification bidders to participate in the bidding; if there are less than 3 bidders qualified for pre-qualification , re-issued the tender notice.
8. The evaluation method of this project adopts the comprehensive evaluation method (see the attached evaluation method for details).
9. After the announcement, all applicants who have the above qualifications and voluntarily participate in the bidding of this project will go to the service window of Yancheng Shuangqing Project Cost Consulting Co., Ltd. of Salt City Bidding and Trading Center (No. 6 Luming East Road, Yancheng City) On the third floor), the form of the “Entrusted Entrustment Letter” and the “Pre-qualification Document” will be available from 15:30 on August 24, 2009 to 15:30 on August 31, 2009 (excluding public holidays and holidays). Put the following information into the “Tender Registration Information Bag” as required, and transfer it to the Yancheng Construction Engineering Trading Center (3rd Floor, No. 6 Luming East Road, Yancheng City), “Construction Project No. 2 Bidding Registration Box”. In addition to the agreement, any of the following materials (1), (2), (3), (4), (5), (6), (7) shall be deemed to be deemed to be Prequalification failed.
(1) The original copy of the power of attorney for the bid applicant. (2) Prequalification documents, in duplicate. (3) The original of the construction qualification certificate (copy), the original of the business license (copy) or the copy of the construction qualification certificate (copy) and the business license (copy) verified by the Yancheng Construction Engineering Trading Center. (4) Original copy of the safety production license (copy). (5) The original copy of the project manager's position employment certificate or the construction engineer's registration certificate or the temporary practice qualification certificate; (6) the original item of the project manager's safety production assessment certificate (Class B); (7) the project manager and the project department (at least three) The original of the labor insurance certificate issued by the unit since 2009 and the original labor contract signed with the unit; (8) other materials that the bid applicant considers necessary. All the above materials must be provided with a copy and bound into a book.
10. Applicants must provide true and complete information on time and on request. The tenderee will verify the information provided by the bid applicant one by one. If the materials provided are found to be untrue, they will be deemed to be unqualified. If the bid applicant violates the conditions stipulated in the Yancheng City Market Integrity Access Regulations (Trial), the bidding qualification will be cancelled.
11. The information provided by the registration unit must be true and complete. Failure to provide true and complete relevant information on time according to the requirements will result in unqualified prequalification. Party A has the right to conduct an examination according to the actual situation. If the result of the examination is inconsistent with the announcement requirements, the bidding qualification will be cancelled.
12. After the pre-qualification is over, please apply for the bidding applicant to the Yancheng Shuangqing Project Cost Consulting Co., Ltd. Yancheng Shuangqing Project Cost Consulting Co., Ltd. Service Window Qualification Pre-qualification Notice or Pre-qualification Admission Notice, if at the specified time If you have not received this notice within the same period, please contact the bidder or Yancheng Shuangqing Project Cost Consulting Co., Ltd. within three days.
13. Applicants from other provinces (municipalities and autonomous regions) who have passed the pre-qualification examination shall submit the original qualifications for verification of the construction administrative department of Jiangsu Province to the No. 1 bidding envelope in accordance with the bidding documents. Submitted, if not submitted, the tender is processed as an invalid tender.
14. If the bidder violates the relevant regulations in the Yancheng City Market Integrity Regulations (Trial), the bidder will be disqualified.
15. Complaint telephone number of the bidding supervision and management agency, 88587313.
Tenderee (official seal):
Phone Address: Tendering Agency (Nanzhang), Xinda Garden, Xindu Garden, Yandu New District:
Contact: You Hongwang Telephone, 13770089996
Address: 5F, 106 Kailuan Avenue, Yancheng City

Attachment: Evaluation method

The bidding project adopts the comprehensive evaluation method for bid evaluation. The bid evaluation committee established by the tenderer according to law shall conduct a comprehensive review of the bid documents according to the bidding quotation, project quality, construction period, construction organization design (including project manager test). A scoring system was adopted to generate three successful candidates according to the score. The tenderee shall be the winning bidder as the winning bidder recommended by the bid evaluation committee in the written bid evaluation report.
I. Review of opening and clearing conditions:
The bid evaluation committee shall review the situation found during the process of clearing and clearing the bid, and it shall not be admitted to the next stage for review.
Second, the evaluation benchmark price is determined:
The bid evaluation price of the bid price is the arithmetic average of the bid quotations of all bidders who have no obvious discarding conditions after the opening and clearing conditions are multiplied by 95%.
Third, participate in the detailed review of the bidder to determine:
Bid documents of bidders who meet the above conditions when the number of bidders whose bidding quotation is not lower than the bidding quotation price is not more than 7 (including 7) Participate in the detailed review; when the number of bidders whose bidding quotation is not lower than the bidding quotation and the bidding quotation is not lower than the bidding quotation, the bidding quotation is lower than the bidding quotation from the above conditions. The bid documents of the seven bidders were selected to participate in the detailed review, and the bid documents of the remaining bidders were no longer involved in the detailed review.
Fourth, detailed review:
(1) Tender offer 70 points
1. Effective bidding price:
1.1 The bid price is in line with the requirements of the bidding documents and bidding questions.
1.2 The bidder's bid price is not lower than the enterprise cost price.
1.3 The bidder's bid price is not higher than the maximum price limit.
1.4 The bidder's bid price is not lower than the bid evaluation base price of the bid price.
2. Quotation calculation
2.1. Participate in the detailed evaluation of the bidder's effective bid price of 70 points.
2.2. The bid quotation of the bidder who participated in the detailed review is deducted by 0.3% for each floating 1%, and deducted from 70 points; when less than 1%, it is calculated according to the insertion method.
3. Deduction points:
3.1. The Bid Evaluation Committee randomly selects a list item of not less than 10 items from a list of parts of the project to conduct a key review (sub-item less than 10 items, all the items are reviewed).
3.2. The comprehensive unit price of the main part of the bidder's engineering quantity list exceeds the benchmark price of the sub-item by ±30%, and each deduction is 0.1 points, and the maximum deduction is 0.4 points.
(Sub-item evaluation of the benchmark price: the arithmetic mean of the unit price of the corresponding part of the project quantity list of the valid bidding quotation participating in the detailed review.)
3.3. If the total amount of the project cost exceeds the benchmark price of the project project by ±30%, deduct 0.3 points.
(Measurement project cost evaluation benchmark price determination: take the arithmetic mean of the total amount of project fees for the corresponding measures of the valid bid price for the detailed review.)
3.4. The project code and project name in the list of engineering quantity list, comprehensive unit price calculation table and comprehensive unit price analysis table must be completely consistent with the engineering quantity list. If there is an inconsistency, deduct 0.1 points (accumulated no more than 1 point) The unit project number is incorrectly deducted by 0.2 points.
3.5. Each part of the project quantity must be reported as a comprehensive unit price. If there is a missing report, deduct 0.2 points (accumulated no more than 1 point).
(II) The quality of the project is 10 points and the basic score is 10 points: if it meets the national quality qualification standards and promises that the bidding documents require quality standards, the basic points are obtained; the quality standards required by the bidding documents are not promised to be scrapped.
(3) The construction period is 10 points and the basic points are 10 points. If the promised construction period is within the time limit required by the bidding documents, the basic points shall be obtained; the time limit for the construction period shall be exceeded.
(4) Construction organization design (including project manager test) 10 points
1. Construction organization design 8 points The construction organization design shall comply with the non-marking requirements stipulated in the bidding documents, and the violators shall be treated as waste. The bid evaluation committee will review the bidder's construction organization design. The scoring interval is 7.5-8 points, divided into one scoring unit by 0.01, and scored and summarized according to the bid evaluation rules of this project. Construction organization design generally must have the following content (but not limited to):
1) General overview of the project;
2) Construction organization structure, construction management personnel (not involving the name of the unit, the name of the specific personnel, etc.);
3) Labor allocation, arrangement planning and safeguard measures;
4) The main construction machinery, processing equipment, testing equipment configuration and material entry plan to be invested;
5) Construction plan of each sub-project (for the project, the construction plan, process method and quality assurance measures of the main sub-items are separately discussed; the construction and treatment methods for the key and difficult parts of the project);
6) Construction measures under special circumstances such as reinforcement and protection of existing facilities and pipelines.
7) Construction schedule and schedule guarantee measures;
8) Site layout;
9) Environmental protection measures;
10) Safe and civilized construction guarantee measures;
11) Seasonal construction measures;
12) Protection measures for on-site components, components, finished products and semi-finished products;
13) Coordination and cooperation plan with the owner and other professional contractors;
14) Late service plan.
2, the project manager comprehensive ability test 2 points bidding project manager must carry the original ID card to participate in the project manager comprehensive ability test, the basic score is 1.5 points; the bid project manager did not carry the original ID card to participate in the project manager comprehensive ability test or did not participate in the project manager For the comprehensive ability test, the item does not score.
The project evaluation manager conducts comprehensive ability test from the construction management of the site, construction of key and difficult parts, safety and civilized construction, comprehensive coordination ability, etc., and comprehensively scores according to the test situation, with a score range of 1.50 to 2.00 points. 0.01 is a scoring unit. Score and summarize according to the evaluation rules.
Five, other
1. Bidders and project managers have any bad behaviors that violate the construction market and the bidding and bidding management regulations. If they are investigated and recorded by the municipal bidding office, the bid evaluation committee shall deduct points according to relevant regulations.
2. Matters not mentioned in these Measures shall be handled by the bid evaluation committee in accordance with laws and regulations.
3. If it does not comply with the provisions of laws and regulations, if there is a restriction on the Yancheng City Integrity Access Regulations, it shall be disposed of in accordance with regulations.
4. If the examination is a false material, it shall be treated as a waste standard.

Solar Lighting Loudspeaker Box is mainly composed of solar panels, lithium iron phosphate batteries, Bluetooth circuit, audio drive circuit, high-fidelity stereo horn, LED lamp module and other components of the solar integrated lamp, and has Bluetooth audio function of cross-border products. Solar lighting loudspeaker box mainly relies on solar energy to provide working energy. It is usually installed in family yard, outdoor cafe, Park square, commercial square, etc.
Usually used for garden BBQ, Party activities, or music playing. Solar lighting loudspeaker box is mainly used with wireless Bluetooth function of the customer terminal (such as smart phones, PAD tablet computers, or notebooks and other intelligent terminals with Bluetooth function), through the special Bluetooth APP software can directly connect solar Bluetooth Sound Lamp, can achieve high-fidelity music playing, working mode and lighting integrated control. At the same time, the solar Bluetooth stereo lamp can also realize various entertainment and intelligent lighting functions, such as working time adjustment, fault problem monitoring and query function, and microphone real-time voice playing function.

Solar Lighting Loudspeaker Box

Solar Lighting Loudspeaker Box,Best Solar Bluetooth Speaker,Solar Lighting Bluetooth Loudspeaker Box,Portable Solar Lighting Loudspeaker Box

ZHEJIANG FIZZ NEW ENERGY CO.,LTD , http://www.ywfizz.com