Automatic constant temperature and constant pressure permeameter "installation and use method" - Database & Sql Blog Articles

Heng Jiaxing AO3401
Probe current, voltage pin 420*4450, head diameter 5.0, over current and voltage pin
Shunuo varistor / ESD varistor / product complete / Sunlord first-class agent
TP-IP4220CZ6 5V 0.35PF breakdown voltage 6V SOT

Automatic constant temperature and constant pressure permeameter

Geotechnical test procedure

Clay permeability

The test method is based on standard R&D design, suitable for various soil types and laboratory conditions.

It offers stable performance, easy operation, and high reliability for long-term use.

Automatic constant temperature and constant pressure permeameter

Technical Parameters:

1. Accuracy: 0.5%

2. Liquid inflow rate: 100ml/min

3. Water trap diameter: φ125 mm

4. Maximum pressure: 2.5MPa

5. Sample size: φ120 x 200 mm

6. Pressure pump with automatic water supply, voltage: 380V

7. Pressure adjustment range: 0 ~ 2.5MPa

8. Overall dimensions: 1200 x 450 x 1260 mm

9. Total weight: 150Kg

Installation and Operation Instructions:

1. Pressure Setting: After power-on, press the "Set" button, then use the "Back" key to navigate. Press the "Shift" key (>) and adjust using "+" and "--" buttons. Save by pressing "Set" again. Exit after setting the lower limit value.

2. Pressure Peak Value: Long press for 3 seconds to enter settings. When the display shows "B", set it to 0 to maintain maximum pressure. You can also set any time unit in minutes, with a minimum of 0.1MPa.

3. Time Reset: To restart the experiment, hold the "--" button. After 10 seconds, the time will reset to 0 minutes. Be careful not to press "!" accidentally.

4. Time Review: Press the "--" key to switch to hour mode. The upper limit is minutes, and the lower limit is seconds. After 30 seconds, return to pressure display.

5. Time Setting: Long press and hold for 3 seconds to enter settings. When the time window shows "T", you can set the pressure increment time in minutes.

6. Zero Adjustment: If no pressure is detected after starting, and it doesn't return to zero, press the "Set" button once. Avoid pressing the "Clear" button when there is pressure; wait until it's released before resetting.

7. Water Injection: Open the water valve and add distilled water. Once the tank is full, start pressurizing and open the pressure control valve to allow water to flow into the high-pressure chamber until it overflows.

After completing the experiment, open the drain valve of the high-pressure tank and clean the instrument surface with anti-rust grease. If the equipment is not used for an extended period, make sure to drain all water from the system to prevent freezing and cracking.

4.2mm Pitch

4.2mm Pitch

4.2mm Pitch

HuiZhou Antenk Electronics Co., LTD , https://www.atkconn.com